Commissioning Support is typically provided by the Process, Mechanical, Electrical, Instrument and Telecoms disciplines. The discipline leads allocate resources from within their departments to organize and assist where necessary, implement the various commissioning activities that are required for the safe functional testing of the specific equipment. This support assistance includes Factory Acceptance Testing (FAT), Site Acceptance Testing (SAT), Pre-commissioning B (type) Installation Test Reports (BITRs and Control Narrative Testing) and Commissioning by Operational Test Procedures (OTPs).

Early interactive transfer of knowledge between the Design, Construction and Commissioning teams allows the incorporation of the commissioning requirements into the design, procurement and construction which minimizes re-work and unnecessary additional costs to the project.

  • Commissioning Planning
  • Drawing up commissioning planning by specialists who are familiar with both design and operation